Aging reinforced concrete bridges across Europe face growing challenges in structural assessment, particularly where material deterioration such as alkali-silica reaction (ASR) makes analytical capacity models unreliable. Proof load testing offers a direct experimental alternative, demonstrating structural adequacy under factored loads without relying solely on analytical predictions. However, the full informational value of proof load test data remains underutilised when test results are interpreted only as binary pass or fail outcomes rather than as quantitative evidence for probabilistic reliability assessment. This dissertation applies a Bayesian reliability updating methodology to the monitoring data obtained during the full-scale proof load test of the viaduct Zijlweg, an ASR-affected reinforced concrete solid slab bridge located in Noord Brabant, the Netherlands. The viaduct was proof loaded in June 2015 at two positions, one critical for bending moment and one critical for shear, generating comprehensive sensor data including concrete strains, crack width changes, and deflections at five incremental load levels up to 1,342 kN. The Bayesian framework of De Vries et al. [2] uses these monitored values specifically concrete strain for bending and maximum weighted nominal crack width for shear to update the structural resistance distribution at each load step and calculate the annual probability of failure before, during, and after the test. In parallel, mechanics-based stop criteria derived from the Critical Shear Crack Theory (CSCT) and the Critical Shear Displacement Theory (CSDT), organised into a traffic light system, are evaluated against the same monitoring data and compared with the Bayesian reliability estimates at each load step. The corrected cross-section analysis, incorporating all four layers of bottom reinforcement from the structural drawings, gives a mean yield moment of 3,248.87 kNm with a coefficient of variation of 0.137. The posterior reliability indices after the complete proof load test are β_after=5.33 for bending and β_after=4.89 for shear, both substantially exceeding the annual target reliability for new structures (β=4.7). The annual target reliability for existing structures at the disapproval level (β=4.0) is achieved after the third load step for bending (β=4.40) and the fourth load step for shear (β=4.41). This corresponds to proof load factors of f_LM1=0.866 for bending and f_LM1=0.849 for shear. The CSCT and CSDT stop criteria indicators remained in the green light range throughout the shear test, qualitatively consistent with the positive β_during values at all load steps. Monitoring data provides a quantifiable advantage over the lower-bound approach: at the third shear load step, the monitoring data demonstrates β_after=3.81 while the lower bound gives only 1.96, an advantage of 1.85 reliability index units attributed to the crack width information in the exponential resistance model. The findings demonstrate the practical feasibility of applying Bayesian reliability updating to real field proof load test data for an ASR-affected bridge, providing a more informative assessment than traditional analytical or lower-bound approaches. The study confirms that proof load testing, interpreted through the Bayesian framework, constitutes an effective Level IV assessment method for ASR-affected bridges that appear analytically insufficient under lower assessment levels. The stop criteria and Bayesian framework are found to be complementary rather than competing, providing operational safety signals during the test and quantitative reliability evidence after the test from the same monitoring measurements.

Aging reinforced concrete bridges across Europe face growing challenges in structural assessment, particularly where material deterioration such as alkali-silica reaction (ASR) makes analytical capacity models unreliable. Proof load testing offers a direct experimental alternative, demonstrating structural adequacy under factored loads without relying solely on analytical predictions. However, the full informational value of proof load test data remains underutilised when test results are interpreted only as binary pass or fail outcomes rather than as quantitative evidence for probabilistic reliability assessment. This dissertation applies a Bayesian reliability updating methodology to the monitoring data obtained during the full-scale proof load test of the viaduct Zijlweg, an ASR-affected reinforced concrete solid slab bridge located in Noord Brabant, the Netherlands. The viaduct was proof loaded in June 2015 at two positions, one critical for bending moment and one critical for shear, generating comprehensive sensor data including concrete strains, crack width changes, and deflections at five incremental load levels up to 1,342 kN. The Bayesian framework of De Vries et al. [2] uses these monitored values specifically concrete strain for bending and maximum weighted nominal crack width for shear to update the structural resistance distribution at each load step and calculate the annual probability of failure before, during, and after the test. In parallel, mechanics-based stop criteria derived from the Critical Shear Crack Theory (CSCT) and the Critical Shear Displacement Theory (CSDT), organised into a traffic light system, are evaluated against the same monitoring data and compared with the Bayesian reliability estimates at each load step. The corrected cross-section analysis, incorporating all four layers of bottom reinforcement from the structural drawings, gives a mean yield moment of 3,248.87 kNm with a coefficient of variation of 0.137. The posterior reliability indices after the complete proof load test are β_after=5.33 for bending and β_after=4.89 for shear, both substantially exceeding the annual target reliability for new structures (β=4.7). The annual target reliability for existing structures at the disapproval level (β=4.0) is achieved after the third load step for bending (β=4.40) and the fourth load step for shear (β=4.41). This corresponds to proof load factors of f_LM1=0.866 for bending and f_LM1=0.849 for shear. The CSCT and CSDT stop criteria indicators remained in the green light range throughout the shear test, qualitatively consistent with the positive β_during values at all load steps. Monitoring data provides a quantifiable advantage over the lower-bound approach: at the third shear load step, the monitoring data demonstrates β_after=3.81 while the lower bound gives only 1.96, an advantage of 1.85 reliability index units attributed to the crack width information in the exponential resistance model. The findings demonstrate the practical feasibility of applying Bayesian reliability updating to real field proof load test data for an ASR-affected bridge, providing a more informative assessment than traditional analytical or lower-bound approaches. The study confirms that proof load testing, interpreted through the Bayesian framework, constitutes an effective Level IV assessment method for ASR-affected bridges that appear analytically insufficient under lower assessment levels. The stop criteria and Bayesian framework are found to be complementary rather than competing, providing operational safety signals during the test and quantitative reliability evidence after the test from the same monitoring measurements.

Bayesian Updating of Bridge Structural Reliability Using Monitoring Data, Stop Criteria, and Proof Load Testing: A Case Study of the Zijlweg Viaduct

MEKONNEN, NEGUSE SOLOMON
2025/2026

Abstract

Aging reinforced concrete bridges across Europe face growing challenges in structural assessment, particularly where material deterioration such as alkali-silica reaction (ASR) makes analytical capacity models unreliable. Proof load testing offers a direct experimental alternative, demonstrating structural adequacy under factored loads without relying solely on analytical predictions. However, the full informational value of proof load test data remains underutilised when test results are interpreted only as binary pass or fail outcomes rather than as quantitative evidence for probabilistic reliability assessment. This dissertation applies a Bayesian reliability updating methodology to the monitoring data obtained during the full-scale proof load test of the viaduct Zijlweg, an ASR-affected reinforced concrete solid slab bridge located in Noord Brabant, the Netherlands. The viaduct was proof loaded in June 2015 at two positions, one critical for bending moment and one critical for shear, generating comprehensive sensor data including concrete strains, crack width changes, and deflections at five incremental load levels up to 1,342 kN. The Bayesian framework of De Vries et al. [2] uses these monitored values specifically concrete strain for bending and maximum weighted nominal crack width for shear to update the structural resistance distribution at each load step and calculate the annual probability of failure before, during, and after the test. In parallel, mechanics-based stop criteria derived from the Critical Shear Crack Theory (CSCT) and the Critical Shear Displacement Theory (CSDT), organised into a traffic light system, are evaluated against the same monitoring data and compared with the Bayesian reliability estimates at each load step. The corrected cross-section analysis, incorporating all four layers of bottom reinforcement from the structural drawings, gives a mean yield moment of 3,248.87 kNm with a coefficient of variation of 0.137. The posterior reliability indices after the complete proof load test are β_after=5.33 for bending and β_after=4.89 for shear, both substantially exceeding the annual target reliability for new structures (β=4.7). The annual target reliability for existing structures at the disapproval level (β=4.0) is achieved after the third load step for bending (β=4.40) and the fourth load step for shear (β=4.41). This corresponds to proof load factors of f_LM1=0.866 for bending and f_LM1=0.849 for shear. The CSCT and CSDT stop criteria indicators remained in the green light range throughout the shear test, qualitatively consistent with the positive β_during values at all load steps. Monitoring data provides a quantifiable advantage over the lower-bound approach: at the third shear load step, the monitoring data demonstrates β_after=3.81 while the lower bound gives only 1.96, an advantage of 1.85 reliability index units attributed to the crack width information in the exponential resistance model. The findings demonstrate the practical feasibility of applying Bayesian reliability updating to real field proof load test data for an ASR-affected bridge, providing a more informative assessment than traditional analytical or lower-bound approaches. The study confirms that proof load testing, interpreted through the Bayesian framework, constitutes an effective Level IV assessment method for ASR-affected bridges that appear analytically insufficient under lower assessment levels. The stop criteria and Bayesian framework are found to be complementary rather than competing, providing operational safety signals during the test and quantitative reliability evidence after the test from the same monitoring measurements.
2025
Bayesian Updating of Bridge Structural Reliability Using Monitoring Data, Stop Criteria, and Proof Load Testing: A Case Study of the Zijlweg Viaduct
Aging reinforced concrete bridges across Europe face growing challenges in structural assessment, particularly where material deterioration such as alkali-silica reaction (ASR) makes analytical capacity models unreliable. Proof load testing offers a direct experimental alternative, demonstrating structural adequacy under factored loads without relying solely on analytical predictions. However, the full informational value of proof load test data remains underutilised when test results are interpreted only as binary pass or fail outcomes rather than as quantitative evidence for probabilistic reliability assessment. This dissertation applies a Bayesian reliability updating methodology to the monitoring data obtained during the full-scale proof load test of the viaduct Zijlweg, an ASR-affected reinforced concrete solid slab bridge located in Noord Brabant, the Netherlands. The viaduct was proof loaded in June 2015 at two positions, one critical for bending moment and one critical for shear, generating comprehensive sensor data including concrete strains, crack width changes, and deflections at five incremental load levels up to 1,342 kN. The Bayesian framework of De Vries et al. [2] uses these monitored values specifically concrete strain for bending and maximum weighted nominal crack width for shear to update the structural resistance distribution at each load step and calculate the annual probability of failure before, during, and after the test. In parallel, mechanics-based stop criteria derived from the Critical Shear Crack Theory (CSCT) and the Critical Shear Displacement Theory (CSDT), organised into a traffic light system, are evaluated against the same monitoring data and compared with the Bayesian reliability estimates at each load step. The corrected cross-section analysis, incorporating all four layers of bottom reinforcement from the structural drawings, gives a mean yield moment of 3,248.87 kNm with a coefficient of variation of 0.137. The posterior reliability indices after the complete proof load test are β_after=5.33 for bending and β_after=4.89 for shear, both substantially exceeding the annual target reliability for new structures (β=4.7). The annual target reliability for existing structures at the disapproval level (β=4.0) is achieved after the third load step for bending (β=4.40) and the fourth load step for shear (β=4.41). This corresponds to proof load factors of f_LM1=0.866 for bending and f_LM1=0.849 for shear. The CSCT and CSDT stop criteria indicators remained in the green light range throughout the shear test, qualitatively consistent with the positive β_during values at all load steps. Monitoring data provides a quantifiable advantage over the lower-bound approach: at the third shear load step, the monitoring data demonstrates β_after=3.81 while the lower bound gives only 1.96, an advantage of 1.85 reliability index units attributed to the crack width information in the exponential resistance model. The findings demonstrate the practical feasibility of applying Bayesian reliability updating to real field proof load test data for an ASR-affected bridge, providing a more informative assessment than traditional analytical or lower-bound approaches. The study confirms that proof load testing, interpreted through the Bayesian framework, constitutes an effective Level IV assessment method for ASR-affected bridges that appear analytically insufficient under lower assessment levels. The stop criteria and Bayesian framework are found to be complementary rather than competing, providing operational safety signals during the test and quantitative reliability evidence after the test from the same monitoring measurements.
Bayesian updating
Proof load testing
Reliability analysis
RC bridge
Stop criteria
File in questo prodotto:
File Dimensione Formato  
Mekonnen_2026_Zijlweg_Viaduct_Reliability.pdf

accesso aperto

Dimensione 3.07 MB
Formato Adobe PDF
3.07 MB Adobe PDF Visualizza/Apri