In this script we therefore want to describe and critically comment on the construction phase of the Malo tunnel. On the basis of construction site experience, the methods of construction of the tunnel will be exposed, highlighting the main construction site criticalities and the related measures adopted by the technical staff during the construction of the work. Finally, in the concluding part of the script, we want to enhance the experience conducted on site, and at the same time the role played by the geologist in the construction of a tunnel, highlighting the strategic function of his professionalism in the combination of knowledge of theoretical notions with the application of the observational method, in order to classify the cluster and define its behavior.
Aspetti geologici e risvolti esecutivi nella costruzione di una galleria naturale
Scozzaro, Salvatore
2021/2022
Abstract
In this script we therefore want to describe and critically comment on the construction phase of the Malo tunnel. On the basis of construction site experience, the methods of construction of the tunnel will be exposed, highlighting the main construction site criticalities and the related measures adopted by the technical staff during the construction of the work. Finally, in the concluding part of the script, we want to enhance the experience conducted on site, and at the same time the role played by the geologist in the construction of a tunnel, highlighting the strategic function of his professionalism in the combination of knowledge of theoretical notions with the application of the observational method, in order to classify the cluster and define its behavior.File | Dimensione | Formato | |
---|---|---|---|
scozzaro_salvatore.pdf
embargo fino al 24/06/2025
Dimensione
38.13 MB
Formato
Adobe PDF
|
38.13 MB | Adobe PDF |
The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License
https://hdl.handle.net/20.500.12608/28695