Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.

Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.

Optimized design process of a full air system in a specific industrial building and comparison with the current HVAC system installed.

FRIGO, SIMONE
2024/2025

Abstract

Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.
2024
Optimized design process of a full air system in a specific industrial building and comparison with the current HVAC system installed.
Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.
Design
Full air
Industrial building
HVAC
Installed
File in questo prodotto:
File Dimensione Formato  
Frigo_Simone.pdf

accesso aperto

Dimensione 31.97 MB
Formato Adobe PDF
31.97 MB Adobe PDF Visualizza/Apri

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/94153