Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.
Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.
Optimized design process of a full air system in a specific industrial building and comparison with the current HVAC system installed.
FRIGO, SIMONE
2024/2025
Abstract
Try to optimize as much as possible the design process of a full air system in a specific industrial building. Starting from the development of a 3D model of the case study, to define then the heating and cooling load, considering also indoor air quality needing. Design of the full-air system with its air handling unit to purchase the required loads through a whole year of operation. Comparison with the current HVAC system installed.| File | Dimensione | Formato | |
|---|---|---|---|
|
Frigo_Simone.pdf
accesso aperto
Dimensione
31.97 MB
Formato
Adobe PDF
|
31.97 MB | Adobe PDF | Visualizza/Apri |
The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License
https://hdl.handle.net/20.500.12608/94153