This thesis work is situated within the context of fluid machinery experimentation, focusing on the optimization and engineering of a scale Pelton turbine test bench. The primary objective of the activity was the complete revamping of the electrical and signal infrastructure to ensure greater measurement reliability and compliance with safety standards. Starting with an assessment of the facility's existing condition, which featured functional but critical cabling regarding organization, obsolete components were removed. The core phase of the work involved redesigning the machine-side layout: new routing paths were defined, and cable trays were installed to ensure an installation according to industry best practices. Subsequently, new structured cabling was implemented to connect the existing field sensors to a newly sized and installed electrical interface panel. This panel was configured to manage power supply and signal distribution, operating in parallel with National Instruments data acquisition (DAQ) systems. The final result is an organized, maintainable, and robust hardware infrastructure that reduces the risk of electromagnetic interference and provides a solid foundation for future experimental campaigns on the turbine.
Il presente lavoro di tesi si inserisce nel contesto della sperimentazione su macchine a fluido, focalizzandosi sull’ottimizzazione e l'ingegnerizzazione del banco prova di una turbina Pelton in scala. L'obiettivo principale dell'attività è stato il revamping completo dell'infrastruttura elettrica e di segnale, al fine di garantire una maggiore affidabilità della misura e la conformità agli standard di sicurezza. Partendo da un’analisi dello stato dell'arte dell'impianto, che presentava un cablaggio funzionale ma critico in termini di organizzazione, si è proceduto alla rimozione della componentistica obsoleta. La fase centrale del lavoro ha riguardato la riprogettazione del layout di bordo macchina: sono stati definiti nuovi percorsi di instradamento e installate canaline porta-cavi per assicurare una posa a regola d’arte. Successivamente, è stato realizzato il nuovo cablaggio strutturato per connettere la sensoristica di campo (già presente sull'impianto) a un nuovo quadro elettrico di interfaccia, appositamente dimensionato e installato. Tale quadro è stato configurato per gestire l'alimentazione e lo smistamento dei segnali, operando in parallelo con i sistemi di acquisizione dati (DAQ) della National Instruments. Il risultato finale è un’infrastruttura hardware ordinata, manutenibile e robusta, che riduce i rischi di interferenze elettromagnetiche e costituisce una base solida per le future campagne sperimentali sulla turbina.
Sviluppo dell'infrastruttura di acquisizione dati su turbina Pelton: cablaggio strutturato ed integrazione con sistemi di acquisizione.
BOSELLI, GIULIO
2025/2026
Abstract
This thesis work is situated within the context of fluid machinery experimentation, focusing on the optimization and engineering of a scale Pelton turbine test bench. The primary objective of the activity was the complete revamping of the electrical and signal infrastructure to ensure greater measurement reliability and compliance with safety standards. Starting with an assessment of the facility's existing condition, which featured functional but critical cabling regarding organization, obsolete components were removed. The core phase of the work involved redesigning the machine-side layout: new routing paths were defined, and cable trays were installed to ensure an installation according to industry best practices. Subsequently, new structured cabling was implemented to connect the existing field sensors to a newly sized and installed electrical interface panel. This panel was configured to manage power supply and signal distribution, operating in parallel with National Instruments data acquisition (DAQ) systems. The final result is an organized, maintainable, and robust hardware infrastructure that reduces the risk of electromagnetic interference and provides a solid foundation for future experimental campaigns on the turbine.| File | Dimensione | Formato | |
|---|---|---|---|
|
Boselli_Giulio_1141422.pdf
Accesso riservato
Dimensione
2.43 MB
Formato
Adobe PDF
|
2.43 MB | Adobe PDF |
The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License
https://hdl.handle.net/20.500.12608/104697