In a context like today's one, in which the energy transition is driven by the European Union towards renewable sources, hydroelectric plants play a key role. However, despite the many ecological advantages associated, since the ‘70s there has been an awareness regarding the impacts that such interventions can have on aquatic ecosystems and on the territory. The present thesis aims to analyze the possible environmental risks and opportunities associated with a mini-hydroelectric plant, with specific reference to the locality of Ferrazze, a district of San Martino Buon Albergo in the province of Verona. To carry out the analysis of possible environmental risks is necessary a regulatory framework, related to the main relevant Directives; and the use of documentation, including the “Valutazione di Impatto Ambientale” procedure related to the project, in order to use documentation and directives as a reference for a subsequent risk analysis through the Preliminary Hazard Analysis technique. Finally, the risks will be related to the opportunities associated with the project.
In un contesto come quello odierno, nel quale la transizione energetica è spinta dall’Unione Europea verso le fonti rinnovabili, gli impianti idroelettrici svolgono un ruolo chiave. Tuttavia, nonostante i molti vantaggi ecologici legati a questi, dagli anni ’70 è nata una consapevolezza verso gli impatti che tali interventi possono generare i sugli ecosistemi acquatici e sul territorio. La tesi presente si prefigge come obiettivo quello di analizzare i possibili rischi ambientali e le opportunità associati a un mini-impianto idroelettrico, con riferimento specifico alla località di Ferrazze, frazione di San Martino Buon Albergo in provincia di Verona. Per effettuare l’analisi dei possibili rischi ambientali è necessario un inquadramento normativo, legato alle principali Direttive inerenti; e l’utilizzo di documentazione, fra cui la procedura di Valutazione di Impatto Ambientale relativa al progetto, in modo da utilizzare documentazione e direttive come riferimento per una successiva analisi di rischio tramite la tecnica del Preliminary Hazard Analysis. Infine, i rischi verranno messi in relazione alle opportunità associate al progetto.
Valutazione di rischi e opportunità per la realizzazione di un mini-impianto idroelettrico
PIACENTINI, VALENTINO
2025/2026
Abstract
In a context like today's one, in which the energy transition is driven by the European Union towards renewable sources, hydroelectric plants play a key role. However, despite the many ecological advantages associated, since the ‘70s there has been an awareness regarding the impacts that such interventions can have on aquatic ecosystems and on the territory. The present thesis aims to analyze the possible environmental risks and opportunities associated with a mini-hydroelectric plant, with specific reference to the locality of Ferrazze, a district of San Martino Buon Albergo in the province of Verona. To carry out the analysis of possible environmental risks is necessary a regulatory framework, related to the main relevant Directives; and the use of documentation, including the “Valutazione di Impatto Ambientale” procedure related to the project, in order to use documentation and directives as a reference for a subsequent risk analysis through the Preliminary Hazard Analysis technique. Finally, the risks will be related to the opportunities associated with the project.| File | Dimensione | Formato | |
|---|---|---|---|
|
Piacentini_Valentino.pdf
accesso aperto
Dimensione
1.88 MB
Formato
Adobe PDF
|
1.88 MB | Adobe PDF | Visualizza/Apri |
The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License
https://hdl.handle.net/20.500.12608/111791