This study aims to analyze and evaluate, for a company operating in the mechanical processing sector, the feasibility of a production transition from a departmental configuration to a production cell configuration, in response to a projected increase in production volumes over a three-year time horizon. The case study is developed starting from an analytical evaluation at the current state, and then identifying the moment of technical convenience for the reorganization, possibly integrating the final structure adopted with anthropomorphic robots. Using discrete-event simulation with Siemens Tecnomatix Plant Simulation, the main operational KPIs will then be compared in order to validate the flow optimization strategy.

Il presente studio si pone l’obiettivo di analizzare e valutare, in merito ad un’azienda operante nell’ambito delle lavorazioni meccaniche, la fattibilità di una transizione produttiva da una configurazione per reparti ad una in celle di produzione, in risposta ad un previsto incremento dei volumi produttivi nell’arco di un orizzonte temporale triennale. Il caso studio si sviluppa a partire da una valutazione analitica allo stato attuale, per poi individuare il momento di convenienza tecnica per la riorganizzazione, integrando eventualmente con robot antropomorfi la struttura finale adottata. Mediante simulazione ad eventi discreti con Siemens Tecnomatix Plant Simulation, verranno poi confrontati i principali KPI operativi al fine di validare la strategia di ottimizzazione del flusso.

Riconfigurazione di impianti di produzione: analisi comparativa tecnico-economica e simulativa con integrazione di automazione robotica

CAMANI, FRANCESCO MARIO
2025/2026

Abstract

This study aims to analyze and evaluate, for a company operating in the mechanical processing sector, the feasibility of a production transition from a departmental configuration to a production cell configuration, in response to a projected increase in production volumes over a three-year time horizon. The case study is developed starting from an analytical evaluation at the current state, and then identifying the moment of technical convenience for the reorganization, possibly integrating the final structure adopted with anthropomorphic robots. Using discrete-event simulation with Siemens Tecnomatix Plant Simulation, the main operational KPIs will then be compared in order to validate the flow optimization strategy.
2025
Reconfiguration of production plants: technical-economic and simulation comparative analysis with the integration of robotic automation
Il presente studio si pone l’obiettivo di analizzare e valutare, in merito ad un’azienda operante nell’ambito delle lavorazioni meccaniche, la fattibilità di una transizione produttiva da una configurazione per reparti ad una in celle di produzione, in risposta ad un previsto incremento dei volumi produttivi nell’arco di un orizzonte temporale triennale. Il caso studio si sviluppa a partire da una valutazione analitica allo stato attuale, per poi individuare il momento di convenienza tecnica per la riorganizzazione, integrando eventualmente con robot antropomorfi la struttura finale adottata. Mediante simulazione ad eventi discreti con Siemens Tecnomatix Plant Simulation, verranno poi confrontati i principali KPI operativi al fine di validare la strategia di ottimizzazione del flusso.
Impianti industriali
Dimensionamento
Cella produttiva
Kpi
Simulazione
File in questo prodotto:
File Dimensione Formato  
Tesi_Riconfigurazione_Impianti_ IIP.pdf

accesso aperto

Dimensione 1.12 MB
Formato Adobe PDF
1.12 MB Adobe PDF Visualizza/Apri

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/115738