This thesis addresses the excessive duration of operations in the pre assembly department of an Italian manufacturing company, where fourteen general-purpose workstations process a wide, heterogeneous mix of codes with no stable product–station association. Tools have no fixed location and small components come from a single centralized kanban area, so much of the operators' time is lost to searching, walking and interruptions, and nominally identical pre-assemblies show highly variable durations. The problem was tackled with Lean Thinking, as structured in the auxiell Lean System, using Group Technology as the analytical basis. The department's output was reclassified into twenty-two families, and over a year of SAP clock-in data was used to rank them by 90th-percentile workload, saturation and required workstations. The valve family, accounting for about one fifth of recorded hours, was chosen as a pilot: two dedicated stations were designed through the 4M framework, with point-of-use components and tools, a two-bin mini-kanban replenished by a milk-runner, and 5S and visual management. In the first week, cycle time fell by 25% and lead time by about one third, with no change to the assembly work itself. This corresponds to about 532 operator-hours and €20,000 saved per year, rising to about €57,000 if extended to the seven highest-priority families. The results show that a lean re-layout pays off most when guided by rigorous family-based prioritization, and provide a replicable roadmap for the whole department.

This thesis addresses the excessive duration of operations in the pre assembly department of an Italian manufacturing company, where fourteen general-purpose workstations process a wide, heterogeneous mix of codes with no stable product–station association. Tools have no fixed location and small components come from a single centralized kanban area, so much of the operators' time is lost to searching, walking and interruptions, and nominally identical pre-assemblies show highly variable durations. The problem was tackled with Lean Thinking, as structured in the auxiell Lean System, using Group Technology as the analytical basis. The department's output was reclassified into twenty-two families, and over a year of SAP clock-in data was used to rank them by 90th-percentile workload, saturation and required workstations. The valve family, accounting for about one fifth of recorded hours, was chosen as a pilot: two dedicated stations were designed through the 4M framework, with point-of-use components and tools, a two-bin mini-kanban replenished by a milk-runner, and 5S and visual management. In the first week, cycle time fell by 25% and lead time by about one third, with no change to the assembly work itself. This corresponds to about 532 operator-hours and €20,000 saved per year, rising to about €57,000 if extended to the seven highest-priority families. The results show that a lean re-layout pays off most when guided by rigorous family-based prioritization, and provide a replicable roadmap for the whole department.

Analysis and Optimization of a pre-assembly department according to the principles of Lean Thinking. The case of an Italian manufacturing company

DIRIGNANI, FRANCESCO
2025/2026

Abstract

This thesis addresses the excessive duration of operations in the pre assembly department of an Italian manufacturing company, where fourteen general-purpose workstations process a wide, heterogeneous mix of codes with no stable product–station association. Tools have no fixed location and small components come from a single centralized kanban area, so much of the operators' time is lost to searching, walking and interruptions, and nominally identical pre-assemblies show highly variable durations. The problem was tackled with Lean Thinking, as structured in the auxiell Lean System, using Group Technology as the analytical basis. The department's output was reclassified into twenty-two families, and over a year of SAP clock-in data was used to rank them by 90th-percentile workload, saturation and required workstations. The valve family, accounting for about one fifth of recorded hours, was chosen as a pilot: two dedicated stations were designed through the 4M framework, with point-of-use components and tools, a two-bin mini-kanban replenished by a milk-runner, and 5S and visual management. In the first week, cycle time fell by 25% and lead time by about one third, with no change to the assembly work itself. This corresponds to about 532 operator-hours and €20,000 saved per year, rising to about €57,000 if extended to the seven highest-priority families. The results show that a lean re-layout pays off most when guided by rigorous family-based prioritization, and provide a replicable roadmap for the whole department.
2025
Analysis and Optimization of a pre-assembly department according to the principles of Lean Thinking. The case of an Italian manufacturing company
This thesis addresses the excessive duration of operations in the pre assembly department of an Italian manufacturing company, where fourteen general-purpose workstations process a wide, heterogeneous mix of codes with no stable product–station association. Tools have no fixed location and small components come from a single centralized kanban area, so much of the operators' time is lost to searching, walking and interruptions, and nominally identical pre-assemblies show highly variable durations. The problem was tackled with Lean Thinking, as structured in the auxiell Lean System, using Group Technology as the analytical basis. The department's output was reclassified into twenty-two families, and over a year of SAP clock-in data was used to rank them by 90th-percentile workload, saturation and required workstations. The valve family, accounting for about one fifth of recorded hours, was chosen as a pilot: two dedicated stations were designed through the 4M framework, with point-of-use components and tools, a two-bin mini-kanban replenished by a milk-runner, and 5S and visual management. In the first week, cycle time fell by 25% and lead time by about one third, with no change to the assembly work itself. This corresponds to about 532 operator-hours and €20,000 saved per year, rising to about €57,000 if extended to the seven highest-priority families. The results show that a lean re-layout pays off most when guided by rigorous family-based prioritization, and provide a replicable roadmap for the whole department.
Group technology
Lean management
Process
Lean thinking
Visual management
File in questo prodotto:
File Dimensione Formato  
Dirignani_Francesco.pdf

Accesso riservato

Dimensione 2.18 MB
Formato Adobe PDF
2.18 MB Adobe PDF

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/116898