This thesis stems from the internship at Considi S.p.A., a consulting firm specialised in Lean process improvement, within a project carried out at Moretto Group S.p.A., an Italian manufacturer of cold-formed sheet-metal components for the automotive, household-appliance, and truck sectors. An initial assessment of the 57 presses of the stamping department, based on MES data, showed an average utilisation rate of 34% and an average OEE of 53%, and identified setup as the leading cause of non-productive time. Interviews on the longest die changes traced these losses to three root causes: the lack of standardised changeover procedures, the lack of coordination between the functions involved in production start-up, and errors in die maintenance. The first two causes were addressed through two complementary intervention lines. Inside the changeover, the SMED methodology, supported by a 5S reorganisation of the workstation, was applied to a pilot die on a 1000-ton press: a video analysis of the changeover led to a standard tooling-up procedure, targeted improvement actions, and a checklist of external activities, for an estimated 19.8% reduction in machine time. Around the changeover, the production start-up process was mapped across five functions with a swim lane diagram; the coordination failures it revealed were traced to four recurring mechanisms and addressed through a redesigned process, supported by a webapp prototype that gives every actor real-time visibility of the plan. To quantify the results, the setup downtime recorded by the MES was broken down by cause: only 42% proved to be the time normally needed to change the die, while 25% was lost to lack of coordination and 30% to die maintenance. On this basis, the two interventions are expected to recover about a quarter of the setup downtime. On the pilot press, ordinary changeovers became 23% shorter after the intervention, in line with the estimate for SMED and 5S, while the contribution of the coordination tool, not yet in operation, remains to be confirmed in the field. At full regime, the expected recovery of about 98 hours per year would raise the availability of the press by 7 points, worth about €27,000 per year in contribution margin. The results show that setup losses cannot be tackled at the workstation alone, and that die maintenance now sets the ceiling to further improvement.

This thesis stems from the internship at Considi S.p.A., a consulting firm specialised in Lean process improvement, within a project carried out at Moretto Group S.p.A., an Italian manufacturer of cold-formed sheet-metal components for the automotive, household-appliance, and truck sectors. An initial assessment of the 57 presses of the stamping department, based on MES data, showed an average utilisation rate of 34% and an average OEE of 53%, and identified setup as the leading cause of non-productive time. Interviews on the longest die changes traced these losses to three root causes: the lack of standardised changeover procedures, the lack of coordination between the functions involved in production start-up, and errors in die maintenance. The first two causes were addressed through two complementary intervention lines. Inside the changeover, the SMED methodology, supported by a 5S reorganisation of the workstation, was applied to a pilot die on a 1000-ton press: a video analysis of the changeover led to a standard tooling-up procedure, targeted improvement actions, and a checklist of external activities, for an estimated 19.8% reduction in machine time. Around the changeover, the production start-up process was mapped across five functions with a swim lane diagram; the coordination failures it revealed were traced to four recurring mechanisms and addressed through a redesigned process, supported by a webapp prototype that gives every actor real-time visibility of the plan. To quantify the results, the setup downtime recorded by the MES was broken down by cause: only 42% proved to be the time normally needed to change the die, while 25% was lost to lack of coordination and 30% to die maintenance. On this basis, the two interventions are expected to recover about a quarter of the setup downtime. On the pilot press, ordinary changeovers became 23% shorter after the intervention, in line with the estimate for SMED and 5S, while the contribution of the coordination tool, not yet in operation, remains to be confirmed in the field. At full regime, the expected recovery of about 98 hours per year would raise the availability of the press by 7 points, worth about €27,000 per year in contribution margin. The results show that setup losses cannot be tackled at the workstation alone, and that die maintenance now sets the ceiling to further improvement.

Reducing Availability Losses through SMED and Digital Cross-Functional Coordination: the Moretto Group Case Study

GOTTI, EVA
2025/2026

Abstract

This thesis stems from the internship at Considi S.p.A., a consulting firm specialised in Lean process improvement, within a project carried out at Moretto Group S.p.A., an Italian manufacturer of cold-formed sheet-metal components for the automotive, household-appliance, and truck sectors. An initial assessment of the 57 presses of the stamping department, based on MES data, showed an average utilisation rate of 34% and an average OEE of 53%, and identified setup as the leading cause of non-productive time. Interviews on the longest die changes traced these losses to three root causes: the lack of standardised changeover procedures, the lack of coordination between the functions involved in production start-up, and errors in die maintenance. The first two causes were addressed through two complementary intervention lines. Inside the changeover, the SMED methodology, supported by a 5S reorganisation of the workstation, was applied to a pilot die on a 1000-ton press: a video analysis of the changeover led to a standard tooling-up procedure, targeted improvement actions, and a checklist of external activities, for an estimated 19.8% reduction in machine time. Around the changeover, the production start-up process was mapped across five functions with a swim lane diagram; the coordination failures it revealed were traced to four recurring mechanisms and addressed through a redesigned process, supported by a webapp prototype that gives every actor real-time visibility of the plan. To quantify the results, the setup downtime recorded by the MES was broken down by cause: only 42% proved to be the time normally needed to change the die, while 25% was lost to lack of coordination and 30% to die maintenance. On this basis, the two interventions are expected to recover about a quarter of the setup downtime. On the pilot press, ordinary changeovers became 23% shorter after the intervention, in line with the estimate for SMED and 5S, while the contribution of the coordination tool, not yet in operation, remains to be confirmed in the field. At full regime, the expected recovery of about 98 hours per year would raise the availability of the press by 7 points, worth about €27,000 per year in contribution margin. The results show that setup losses cannot be tackled at the workstation alone, and that die maintenance now sets the ceiling to further improvement.
2025
Reducing Availability Losses through SMED and Digital Cross-Functional Coordination: the Moretto Group Case Study
This thesis stems from the internship at Considi S.p.A., a consulting firm specialised in Lean process improvement, within a project carried out at Moretto Group S.p.A., an Italian manufacturer of cold-formed sheet-metal components for the automotive, household-appliance, and truck sectors. An initial assessment of the 57 presses of the stamping department, based on MES data, showed an average utilisation rate of 34% and an average OEE of 53%, and identified setup as the leading cause of non-productive time. Interviews on the longest die changes traced these losses to three root causes: the lack of standardised changeover procedures, the lack of coordination between the functions involved in production start-up, and errors in die maintenance. The first two causes were addressed through two complementary intervention lines. Inside the changeover, the SMED methodology, supported by a 5S reorganisation of the workstation, was applied to a pilot die on a 1000-ton press: a video analysis of the changeover led to a standard tooling-up procedure, targeted improvement actions, and a checklist of external activities, for an estimated 19.8% reduction in machine time. Around the changeover, the production start-up process was mapped across five functions with a swim lane diagram; the coordination failures it revealed were traced to four recurring mechanisms and addressed through a redesigned process, supported by a webapp prototype that gives every actor real-time visibility of the plan. To quantify the results, the setup downtime recorded by the MES was broken down by cause: only 42% proved to be the time normally needed to change the die, while 25% was lost to lack of coordination and 30% to die maintenance. On this basis, the two interventions are expected to recover about a quarter of the setup downtime. On the pilot press, ordinary changeovers became 23% shorter after the intervention, in line with the estimate for SMED and 5S, while the contribution of the coordination tool, not yet in operation, remains to be confirmed in the field. At full regime, the expected recovery of about 98 hours per year would raise the availability of the press by 7 points, worth about €27,000 per year in contribution margin. The results show that setup losses cannot be tackled at the workstation alone, and that die maintenance now sets the ceiling to further improvement.
SMED
Digital Coordination
Availability Losses
File in questo prodotto:
File Dimensione Formato  
Gotti_Eva.pdf

Accesso riservato

Dimensione 5.66 MB
Formato Adobe PDF
5.66 MB Adobe PDF

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/118462