This thesis examines the application of Lean Production principles to the cable department of Lika Electronic S.r.l., a manufacturer of encoders and actuators based in Carrè (Vicenza). The company works on a high-mix low-volume profile, with half of its turnover generated by orders of fewer than ten pieces. At the start of the work its average customer lead time was about four weeks and on-time delivery stood at around fifty per cent, against targets of two weeks and ninety per cent. The project, carried out with the consulting firm Sintesia S.r.l., began with a Value Stream Mapping workshop on the I58 encoder family. The Current State Map showed a lead time of 59.93 working days against a cycle time of 23.75 minutes, and the root cause analysis traced a large share of the waiting to the semi-finished stages that feed assembly. After the SMD department, the cable department, which worked in batches, was selected as the next area of intervention. Two interventions were carried out over the same period. After a test showed that one piece flow cut the time needed to complete the first cable by two thirds, the shared workbenches were progressively replaced by four single-operator cells, while a production kanban loop toward Warehouse 1 was extended to 45 of the 444 codes handled by the department, selected through an ABC-RRS classification of consumption volume and regularity. The results were monitored weekly through seven indicators between week 5 and week 39 of 2026. The average replenishment lead time fell from 22.95 to 4.12 working days, stock-outs disappeared over the closing weeks, the pieces held in overdue internal work proposals and orders fell by 99 and 77 per cent, and a comparable output was obtained with a fifth fewer hours worked, an increase in productivity of about 19 per cent. The case suggests that in a high-mix low-volume context the viability of a pull system depends less on the profile of the company as a whole than on a selective choice of the codes to which it is applied, and that the loop becomes stable only once the flow it regulates has been reorganised and the work it releases is sequenced day by day. Further gains are expected from the new cutting and winding machine, which is also the condition for bringing the outsourced volumes back in house.

La presente tesi analizza l’applicazione dei principi della Lean Production al reparto cavi di Lika Electronic S.r.l., azienda produttrice di encoder e attuatori con sede a Carrè (Vicenza). L’azienda opera secondo un profilo high-mix low-volume, con metà del fatturato generata da ordini inferiori ai dieci pezzi. All’avvio del lavoro il lead time medio verso il cliente era di circa quattro settimane e la puntualità di consegna si attestava intorno al cinquanta per cento, a fronte di obiettivi pari rispettivamente a due settimane e al novanta per cento. Il progetto, svolto in collaborazione con la società di consulenza Sintesia S.r.l., è partito da un workshop di Value Stream Mapping sulla famiglia di encoder I58. La Current State Map ha evidenziato un lead time di 59,93 giorni lavorativi a fronte di un tempo ciclo di 23,75 minuti, e l’analisi delle cause radice ha ricondotto buona parte delle attese alle fasi di semilavorazione che alimentano il montaggio. Dopo il reparto SMD, è stato quindi individuato come successiva area di intervento il reparto cavi, che lavorava a lotti. Nello stesso periodo sono stati realizzati due interventi. Dopo che una prova aveva mostrato come il one piece flow riducesse di due terzi il tempo necessario a completare il primo cavo, i banchi di lavoro condivisi sono stati progressivamente sostituiti da quattro celle monoperatore; in parallelo, un loop kanban di produzione verso il Magazzino 1 è stato esteso a 45 dei 444 codici gestiti dal reparto, selezionati tramite una classificazione ABC-RRS basata su volume e regolarità dei consumi. I risultati sono stati monitorati settimanalmente attraverso sette indicatori tra la settimana 5 e la settimana 39 del 2026. Il lead time medio di riapprovvigionamento è sceso da 22,95 a 4,12 giorni lavorativi, le rotture di stock sono scomparse nelle ultime settimane del periodo, i pezzi contenuti in proposte di lavoro e ordini interni in ritardo si sono ridotti rispettivamente del 99 e del 77 per cento, e un output paragonabile è stato ottenuto con un quinto di ore lavorate in meno, pari a un aumento di produttività di circa il 19 per cento. Il caso suggerisce che, in un contesto high-mix low-volume, la praticabilità di un sistema pull dipenda meno dal profilo dell’azienda nel suo complesso che da una scelta selettiva dei codici a cui applicarlo, e che il loop diventi stabile solo dopo aver riorganizzato il flusso che regola e aver sequenziato giorno per giorno il lavoro che rilascia. Ulteriori miglioramenti sono attesi dalla nuova macchina di taglio e avvolgimento, che rappresenta anche la condizione per riportare internamente i volumi oggi esternalizzati.

Lean Transformation of a Cable Production Department. A Value Stream Mapping and One Piece Flow Case Study at Lika Electronic S.r.l.

ONGARATO, ALBERTO
2025/2026

Abstract

This thesis examines the application of Lean Production principles to the cable department of Lika Electronic S.r.l., a manufacturer of encoders and actuators based in Carrè (Vicenza). The company works on a high-mix low-volume profile, with half of its turnover generated by orders of fewer than ten pieces. At the start of the work its average customer lead time was about four weeks and on-time delivery stood at around fifty per cent, against targets of two weeks and ninety per cent. The project, carried out with the consulting firm Sintesia S.r.l., began with a Value Stream Mapping workshop on the I58 encoder family. The Current State Map showed a lead time of 59.93 working days against a cycle time of 23.75 minutes, and the root cause analysis traced a large share of the waiting to the semi-finished stages that feed assembly. After the SMD department, the cable department, which worked in batches, was selected as the next area of intervention. Two interventions were carried out over the same period. After a test showed that one piece flow cut the time needed to complete the first cable by two thirds, the shared workbenches were progressively replaced by four single-operator cells, while a production kanban loop toward Warehouse 1 was extended to 45 of the 444 codes handled by the department, selected through an ABC-RRS classification of consumption volume and regularity. The results were monitored weekly through seven indicators between week 5 and week 39 of 2026. The average replenishment lead time fell from 22.95 to 4.12 working days, stock-outs disappeared over the closing weeks, the pieces held in overdue internal work proposals and orders fell by 99 and 77 per cent, and a comparable output was obtained with a fifth fewer hours worked, an increase in productivity of about 19 per cent. The case suggests that in a high-mix low-volume context the viability of a pull system depends less on the profile of the company as a whole than on a selective choice of the codes to which it is applied, and that the loop becomes stable only once the flow it regulates has been reorganised and the work it releases is sequenced day by day. Further gains are expected from the new cutting and winding machine, which is also the condition for bringing the outsourced volumes back in house.
2025
Lean Transformation of a Cable Production Department. A Value Stream Mapping and One Piece Flow Case Study at Lika Electronic S.r.l.
La presente tesi analizza l’applicazione dei principi della Lean Production al reparto cavi di Lika Electronic S.r.l., azienda produttrice di encoder e attuatori con sede a Carrè (Vicenza). L’azienda opera secondo un profilo high-mix low-volume, con metà del fatturato generata da ordini inferiori ai dieci pezzi. All’avvio del lavoro il lead time medio verso il cliente era di circa quattro settimane e la puntualità di consegna si attestava intorno al cinquanta per cento, a fronte di obiettivi pari rispettivamente a due settimane e al novanta per cento. Il progetto, svolto in collaborazione con la società di consulenza Sintesia S.r.l., è partito da un workshop di Value Stream Mapping sulla famiglia di encoder I58. La Current State Map ha evidenziato un lead time di 59,93 giorni lavorativi a fronte di un tempo ciclo di 23,75 minuti, e l’analisi delle cause radice ha ricondotto buona parte delle attese alle fasi di semilavorazione che alimentano il montaggio. Dopo il reparto SMD, è stato quindi individuato come successiva area di intervento il reparto cavi, che lavorava a lotti. Nello stesso periodo sono stati realizzati due interventi. Dopo che una prova aveva mostrato come il one piece flow riducesse di due terzi il tempo necessario a completare il primo cavo, i banchi di lavoro condivisi sono stati progressivamente sostituiti da quattro celle monoperatore; in parallelo, un loop kanban di produzione verso il Magazzino 1 è stato esteso a 45 dei 444 codici gestiti dal reparto, selezionati tramite una classificazione ABC-RRS basata su volume e regolarità dei consumi. I risultati sono stati monitorati settimanalmente attraverso sette indicatori tra la settimana 5 e la settimana 39 del 2026. Il lead time medio di riapprovvigionamento è sceso da 22,95 a 4,12 giorni lavorativi, le rotture di stock sono scomparse nelle ultime settimane del periodo, i pezzi contenuti in proposte di lavoro e ordini interni in ritardo si sono ridotti rispettivamente del 99 e del 77 per cento, e un output paragonabile è stato ottenuto con un quinto di ore lavorate in meno, pari a un aumento di produttività di circa il 19 per cento. Il caso suggerisce che, in un contesto high-mix low-volume, la praticabilità di un sistema pull dipenda meno dal profilo dell’azienda nel suo complesso che da una scelta selettiva dei codici a cui applicarlo, e che il loop diventi stabile solo dopo aver riorganizzato il flusso che regola e aver sequenziato giorno per giorno il lavoro che rilascia. Ulteriori miglioramenti sono attesi dalla nuova macchina di taglio e avvolgimento, che rappresenta anche la condizione per riportare internamente i volumi oggi esternalizzati.
Lean Production
Value Stream Mapping
One Piece Flow
Kanban
File in questo prodotto:
File Dimensione Formato  
Ongarato_Alberto.pdf

accesso aperto

Dimensione 7.13 MB
Formato Adobe PDF
7.13 MB Adobe PDF Visualizza/Apri

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/118466