In the following paper, we attempt to investigate the leading causes, effects, and solutions to the problems of a finished goods warehouse in a manufacturing plant where the upstream process, the productive one, follows the push logic. Specifically, we aim to identify waste in handling finished goods in the Lonigo warehouse (Verallia Group) by integrationg value stream mapping with work sampling as a timing tool. In addition, the study aims to identify the root causes and propose countermeasures to help minimize the identified wastes.

Redesigning the warehouse flow through value stream mapping and work sampling: the case of Verallia SPA

Ilie, Adam
2021/2022

Abstract

In the following paper, we attempt to investigate the leading causes, effects, and solutions to the problems of a finished goods warehouse in a manufacturing plant where the upstream process, the productive one, follows the push logic. Specifically, we aim to identify waste in handling finished goods in the Lonigo warehouse (Verallia Group) by integrationg value stream mapping with work sampling as a timing tool. In addition, the study aims to identify the root causes and propose countermeasures to help minimize the identified wastes.
2021-07
Lean warehousing, VSM, Work Sampling, Waste
File in questo prodotto:
File Dimensione Formato  
Adam_Ilie.pdf

embargo fino al 16/06/2024

Dimensione 3.43 MB
Formato Adobe PDF
3.43 MB Adobe PDF

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/28708