The thesis project involved the design of a manual assembly line of floor sweepers, the Rider 1201, at the company Eureka SpA of Cittadella, manufacturer of professional machines for industrial cleaning. The objective of the project was to build an assembly line, from the situation in which each operator takes care of the entire process to the moment in which it is divided into several stages, in order to increase productivity and business revenues. After an introduction to the initial situation, in which slender thinking tools were used, such as waste identification, value flow mapping and spaghetti chart to highlight the critical points of the line, the work conducted, which can be summarised as follows: Activity subdivision of the two models of the Rider Construction of the precedence diagrams Time recording Phase balancing Creation of the hypothetical layout Due to the ongoing projects, it has not yet been possible to apply the work done but it is a starting point for the future creation of the line of sweepers.

Il progetto di tesi ha riguardato la progettazione di una linea di assemblaggio manuale di motoscope, la Rider 1201, presso la ditta Eureka SpA di Cittadella, produttrice di macchine professionali per la pulizia industriale. L’obiettivo del progetto è stato quello di costruire una linea di assemblaggio, passando dalla situazione in cui ogni operatore si occupa dell’intero processo a quella in cui esso viene suddiviso in più fasi, al fine di aumentare la produttività e i ricavi aziendali. Dopo una introduzione della situazione iniziale, in cui sono stati utilizzati strumenti del pensiero snello, quali individuazione degli sprechi, mappatura del flusso di valore e spaghetti chart per evidenziare le criticità della linea, viene presentato il lavoro condotto, che può essere riassunto nei punti seguenti: Suddivisione attività dei due modelli della Rider Costruzione dei diagrammi delle precedenze Rilevazione tempi Bilanciamento delle fasi Creazione dell’ipotetico layout Per via dei progetti in corso, non è stato ancora possibile applicare il lavoro svolto ma costituisce un punto di partenza per la futura creazione della linea della motoscopa.

Progettazione di una linea di assemblaggio manuale: caso Eureka S.p.A.

BENETELLO, FEDERICO
2021/2022

Abstract

The thesis project involved the design of a manual assembly line of floor sweepers, the Rider 1201, at the company Eureka SpA of Cittadella, manufacturer of professional machines for industrial cleaning. The objective of the project was to build an assembly line, from the situation in which each operator takes care of the entire process to the moment in which it is divided into several stages, in order to increase productivity and business revenues. After an introduction to the initial situation, in which slender thinking tools were used, such as waste identification, value flow mapping and spaghetti chart to highlight the critical points of the line, the work conducted, which can be summarised as follows: Activity subdivision of the two models of the Rider Construction of the precedence diagrams Time recording Phase balancing Creation of the hypothetical layout Due to the ongoing projects, it has not yet been possible to apply the work done but it is a starting point for the future creation of the line of sweepers.
2021
Design of a manual assembly line: Eureka S.p.A.
Il progetto di tesi ha riguardato la progettazione di una linea di assemblaggio manuale di motoscope, la Rider 1201, presso la ditta Eureka SpA di Cittadella, produttrice di macchine professionali per la pulizia industriale. L’obiettivo del progetto è stato quello di costruire una linea di assemblaggio, passando dalla situazione in cui ogni operatore si occupa dell’intero processo a quella in cui esso viene suddiviso in più fasi, al fine di aumentare la produttività e i ricavi aziendali. Dopo una introduzione della situazione iniziale, in cui sono stati utilizzati strumenti del pensiero snello, quali individuazione degli sprechi, mappatura del flusso di valore e spaghetti chart per evidenziare le criticità della linea, viene presentato il lavoro condotto, che può essere riassunto nei punti seguenti: Suddivisione attività dei due modelli della Rider Costruzione dei diagrammi delle precedenze Rilevazione tempi Bilanciamento delle fasi Creazione dell’ipotetico layout Per via dei progetti in corso, non è stato ancora possibile applicare il lavoro svolto ma costituisce un punto di partenza per la futura creazione della linea della motoscopa.
assemblaggio
progettazione
linea
File in questo prodotto:
File Dimensione Formato  
Benetello_Federico.pdf

accesso riservato

Dimensione 4.82 MB
Formato Adobe PDF
4.82 MB Adobe PDF

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/41340