Introduction of the causes of the decommissioning of the "Valle" purification plant in the municipality of Castelgomberto (VI), geographical location, current state and criticality of the sewerage and purification system. The objective is to convey the wastewater into the sewerage network of Sovizzo (neighboring municipality), creating a new sewerage backbone that collects the wastewater currently treated by the "Valle" purification plant and that received from the "Val di Molino" lifting plant in Castelgomberto to deliver them to the "Marconi" lifting plant in the municipality of Sovizzo and subsequently to the Casale purification plant soon to be built in Vicenza. The project interventions are examined and studied, in particular: sizing of sewer pipes, overflow structures and lifting systems, complete with hydraulic checks using SWMM software. Finally, the five project alternatives are analyzed based on some fundamental aspects: hydraulic, environmental, authorisation, social, management and economic. Evaluate and identify which of these alternatives is the viable solution with reference to the aspects mentioned above.
Introduzione delle cause della dismissione dell'impianto di depurazione "Valle" nel comune di Castelgomberto (VI), localizzazione geografica, stato attuale e criticità del sistema fognario e depurativo. L'obiettivo è il convogliamento dei reflui nella rete fognaria di Sovizzo (comune limitrofo), creando una nuova dorsale di fognatura che raccolga le acque reflue attualmente trattate dall’impianto di depurazione "Valle" e quelle ricevute dall’impianto di sollevamento “Val di Molino” a Castelgomberto per recapitarle all’impianto di sollevamento “Marconi” in comune di Sovizzo e successivamente all’impianto di depurazione di Casale di prossima realizzazione a Vicenza. Si esaminano e studiano gli interventi di progetto, in particolar modo: dimensionamento di condotte per fognatura (nere), manufatti di sfioro e impianti di sollevamento, con tanto di verifiche idrauliche tramite software SWMM. Infine, si analizzano le cinque alternative di progetto basandosi su alcuni aspetti fondamentali: idraulici, ambientali, autorizzativi,sociali, gestionali ed economici. Valutare e individuare quale tra queste alternative sia la soluzione perseguibile con riferimento agli aspetti citati sopra.
Dimensionamento delle Condotte di Fognatura a Castelgomberto e Sovizzo (VI) in seguito alla Dismissione dell'impianto di Depurazione "Valle".
BORRELLI, SIMONE
2023/2024
Abstract
Introduction of the causes of the decommissioning of the "Valle" purification plant in the municipality of Castelgomberto (VI), geographical location, current state and criticality of the sewerage and purification system. The objective is to convey the wastewater into the sewerage network of Sovizzo (neighboring municipality), creating a new sewerage backbone that collects the wastewater currently treated by the "Valle" purification plant and that received from the "Val di Molino" lifting plant in Castelgomberto to deliver them to the "Marconi" lifting plant in the municipality of Sovizzo and subsequently to the Casale purification plant soon to be built in Vicenza. The project interventions are examined and studied, in particular: sizing of sewer pipes, overflow structures and lifting systems, complete with hydraulic checks using SWMM software. Finally, the five project alternatives are analyzed based on some fundamental aspects: hydraulic, environmental, authorisation, social, management and economic. Evaluate and identify which of these alternatives is the viable solution with reference to the aspects mentioned above.File | Dimensione | Formato | |
---|---|---|---|
TESI DI LAUREA IAT SIMONE BORRELLI 2036239.pdf
accesso aperto
Dimensione
9.3 MB
Formato
Adobe PDF
|
9.3 MB | Adobe PDF | Visualizza/Apri |
The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License
https://hdl.handle.net/20.500.12608/71483