This thesis aims to analyze the functional condition of the hydraulic-forestry works built along the Ruina, Acquabona, and Val di Pach streams, located in the municipalities of Strembo and Bocenago in Val Rendena (Trentino, Italy), a mountain area subject to hydrogeological risk. Six years later, an update of the monitoring of these streams is proposed. They had been selected as a study area within the LIFE FRANCA (Flood Risk ANticipation and Communication in the Alps) project, a European initiative that promotes the anticipation and communication of flood risk in the Alps, which ended in December 2019. The thesis focuses in particular on the efficiency of traditional and filtering check dams, fundamental structures for regulating sediment transport and mitigating flood hazards in alpine torrent environments. The core of the analysis is represented by the application of the Maintenance Priority index (MPi), a composite index developed to synthetically and objectively assess the maintenance priority of existing works. This tool, applied only in the cases of Ruina and Acquabona, takes into account both the residual functionality of the structure with respect to its primary design purpose and the structural condition observed during field surveys through dedicated evaluation forms. The collected data were processed to assign each check dam an MPi value and a corresponding priority class, thus providing a decision-making basis useful for maintenance planning by public authorities and land managers. Overall, the adopted methodology made it possible to provide a clear and updated overview of the condition of the hydraulic-forestry works, supporting a preventive approach to risk management. The study confirms the usefulness of the MPi as an operational tool for technicians and administrators, contributing to the promotion of sustainable and informed management of the mountain hydrographic network.

La presente tesi si propone di analizzare lo stato funzionale delle opere di sistemazione idraulico-forestale realizzate lungo i rivi Ruina, Acquabona e Val di Pach, situati nei comuni di Strembo e Bocenago in Val Rendena (TN), territorio montano soggetto a rischio idrogeologico. A distanza di sei anni, si propone un aggiornamento nel monitoraggio di questi rivi, i quali erano stati scelti come area di studio dal progetto LIFE FRANCA (Flood Risk ANticipation and Communication in the Alps ) un progetto europeo che promuove l’anticipazione e la comunicazione del rischio alluvionale nelle Alpi, concluso a Dicembre 2019. L’elaborato si focalizza in particolare sull’efficienza di briglie tradizionali e filtranti, strutture fondamentali per la regolazione del trasporto solido e la mitigazione del pericolo alluvionale in ambienti torrentizi alpini. Il fulcro dell’analisi è rappresentato dall’applicazione del Maintenance Priority index (MPi), un indice composito sviluppato per valutare in maniera sintetica e oggettiva la priorità di manutenzione delle opere esistenti. Questo strumento, applicato solo nel caso di Ruina e di Acquabona, prende in considerazione sia la funzionalità residua della struttura rispetto alla funzione primaria per cui è stata progettata, sia lo stato strutturale rilevato durante rilievi in campo attraverso apposite schede valutative. I dati raccolti sono stati elaborati per attribuire a ciascuna briglia un valore di MPi e una conseguente classe di priorità, in modo da fornire una base decisionale utile alla pianificazione degli interventi manutentivi da parte di enti pubblici e gestori del territorio. Nel complesso, la metodologia adottata ha permesso di fornire un quadro chiaro e aggiornato dello stato delle opere di sistemazione idraulico-forestale, supportando un approccio preventivo alla gestione del rischio. Lo studio conferma l’utilità dell’indice MPi come strumento operativo per tecnici e amministratori, contribuendo alla promozione di una gestione sostenibile e consapevole del reticolo idrografico montano.

Valutazione delle opere idraulico-forestali mediante MPi: il caso dei rivi Ruina e Acquabona (Val Rendena, TN)

SARTORI, GIANNA
2024/2025

Abstract

This thesis aims to analyze the functional condition of the hydraulic-forestry works built along the Ruina, Acquabona, and Val di Pach streams, located in the municipalities of Strembo and Bocenago in Val Rendena (Trentino, Italy), a mountain area subject to hydrogeological risk. Six years later, an update of the monitoring of these streams is proposed. They had been selected as a study area within the LIFE FRANCA (Flood Risk ANticipation and Communication in the Alps) project, a European initiative that promotes the anticipation and communication of flood risk in the Alps, which ended in December 2019. The thesis focuses in particular on the efficiency of traditional and filtering check dams, fundamental structures for regulating sediment transport and mitigating flood hazards in alpine torrent environments. The core of the analysis is represented by the application of the Maintenance Priority index (MPi), a composite index developed to synthetically and objectively assess the maintenance priority of existing works. This tool, applied only in the cases of Ruina and Acquabona, takes into account both the residual functionality of the structure with respect to its primary design purpose and the structural condition observed during field surveys through dedicated evaluation forms. The collected data were processed to assign each check dam an MPi value and a corresponding priority class, thus providing a decision-making basis useful for maintenance planning by public authorities and land managers. Overall, the adopted methodology made it possible to provide a clear and updated overview of the condition of the hydraulic-forestry works, supporting a preventive approach to risk management. The study confirms the usefulness of the MPi as an operational tool for technicians and administrators, contributing to the promotion of sustainable and informed management of the mountain hydrographic network.
2024
Assessment of hydraulic-forestry interventions through MPi: a case study of the Ruina and Acquabona streams (Val Rendena, TN)
La presente tesi si propone di analizzare lo stato funzionale delle opere di sistemazione idraulico-forestale realizzate lungo i rivi Ruina, Acquabona e Val di Pach, situati nei comuni di Strembo e Bocenago in Val Rendena (TN), territorio montano soggetto a rischio idrogeologico. A distanza di sei anni, si propone un aggiornamento nel monitoraggio di questi rivi, i quali erano stati scelti come area di studio dal progetto LIFE FRANCA (Flood Risk ANticipation and Communication in the Alps ) un progetto europeo che promuove l’anticipazione e la comunicazione del rischio alluvionale nelle Alpi, concluso a Dicembre 2019. L’elaborato si focalizza in particolare sull’efficienza di briglie tradizionali e filtranti, strutture fondamentali per la regolazione del trasporto solido e la mitigazione del pericolo alluvionale in ambienti torrentizi alpini. Il fulcro dell’analisi è rappresentato dall’applicazione del Maintenance Priority index (MPi), un indice composito sviluppato per valutare in maniera sintetica e oggettiva la priorità di manutenzione delle opere esistenti. Questo strumento, applicato solo nel caso di Ruina e di Acquabona, prende in considerazione sia la funzionalità residua della struttura rispetto alla funzione primaria per cui è stata progettata, sia lo stato strutturale rilevato durante rilievi in campo attraverso apposite schede valutative. I dati raccolti sono stati elaborati per attribuire a ciascuna briglia un valore di MPi e una conseguente classe di priorità, in modo da fornire una base decisionale utile alla pianificazione degli interventi manutentivi da parte di enti pubblici e gestori del territorio. Nel complesso, la metodologia adottata ha permesso di fornire un quadro chiaro e aggiornato dello stato delle opere di sistemazione idraulico-forestale, supportando un approccio preventivo alla gestione del rischio. Lo studio conferma l’utilità dell’indice MPi come strumento operativo per tecnici e amministratori, contribuendo alla promozione di una gestione sostenibile e consapevole del reticolo idrografico montano.
briglie
torrente montano
manutenzione
MPi
pericolo
File in questo prodotto:
File Dimensione Formato  
TESI_Gianna_Sartori.pdf

accesso aperto

Dimensione 8.31 MB
Formato Adobe PDF
8.31 MB Adobe PDF Visualizza/Apri

The text of this website © Università degli studi di Padova. Full Text are published under a non-exclusive license. Metadata are under a CC0 License

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12608/93999